This is one of eleven questions posed to the prospective developer for the plans at the former Barn Hotel at our special public meeting on 23 October 2024.

Written answers

There are local concerns about increased traffic and blocked access during construction. What specific measures will the developer implement to manage access to the site (specifically the footpath/cycle route connecting Eversley Crescent to West End Road) and to, minimise disruptions to local traffic, and ensure the safety of pedestrians and residents throughout the construction period? How will construction-related traffic access the site?

All Construction traffic would enter and exit the site through the main access off West End Road roundabout.  A gateman will be present to direct traffic movements and ensure public safety.

The pedestrian route through Garden Close will be maintained during the Construction Phase.

In the event that consent is granted, the site will be subject to the requirement to adhere to a strict construction management plan which will be required to demonstrate that there will be no impact on highway or pedestrian safety and operations during construction.

Special Public Meeting – 23 Oct 2024
Introduction & Welcome (3 min 43 sec)
Developer’s presentation: overview of plans (11 min 53 sec)
Q1 – Parking (2 min 14 sec)
Q2a – Access during construction (2 min 55 sec)
Q2b – Access after construction (2 min 50 sec)
Q3 – Consideration for deliveries (4 min 45 sec)
Q4 – Proximity to existing homes (3 min 37 sec)
Q5 – Design of new buildings (3 min 55 sec)
Q6 – Private amenity space (2 min 46 sec)
Q7 – Listed building restoration (4 min 51 sec)
Q8 – Affordable housing (2 min 46 sec)
Q9 – Environment and flooding (4 min 33 sec)
Q10 – New infrastructure (3 min 36 sec)
Q11 – Timescales (1 min 31 sec)
Public Q&A session (1 hour 1 minute)

Comments are closed.